BUILDING REMODEL

Follow our building project progress as we make room for what's next at City Gate!

FOR THE NEXT ONE

City Gate Building Project

Last updated: November 2026


We're making room for what's next!


Why are we doing this? It's for the next one.


The next person who walks through our doors looking for hope. The next family searching for a church to call home. The next child who will learn about Jesus.


We're making improvements to our building because we believe God has more ahead for City Gate, and we want to be ready to welcome the people He sends our way.


Here's a look at where things stand!

Our current goal is to make significant progress on the bathrooms, kitchen flooring, and hallway flooring by January/February 2027. Construction schedules may change as work progresses.

PROJECT PROGRESS

WOMEN'S BATHROOM

IN PROGRESS | COMPLETE REBUILD

This project turned into much more than we originally anticipated! During the plumbing work, we discovered significant rot and found that parts of the floor were, quite literally, miraculously still holding up!


What began as a bathroom update quickly became a complete rebuild. That meant new tile, electrical, plumbing, insulation, drywall, and all new fixtures. This unexpected discovery has added to both our cost and timeline, but we know it will be beautiful when it's finished!


COMPLETED

  • Old plumbing, toilets and sinks removed
  • New plumbing installed
  • Partitions removed
  • Dated drop-down ceiling tiles removed
  • Fluorescent lighting removed
  • Ceiling raised and reframed
  • Old floor tiles removed and area prepped for new tile
  • Tile purchased and ready for installation


UP NEXT

  • Electrical work and new lighting
  • Remove old insulation where needed and install new insulation
  • Install drywall ceiling
  • Install floor tile
  • Complete plumbing fixtures and install new toilets
  • Install new counter and sinks
  • Fabricate and install bathroom partitions


Right now, we're making the best of a pretty crazy construction zone! We currently have no lights or sinks and just one toilet with no partitions! If you don't laugh, you'll cry. But there's no need for that. We're making it work! It will be worth it in the end.

MEN'S BATHROOM

COMPLETED

  • Asbestos inspected and mitigated
  • Completely gutted
  • Floors rebuilt
  • Water barrier installed on foundation
  • New plumbing installed
  • Original wall removed
  • New firewall framing installed


IN PROGRESS | LAYOUT & CONSTRUCTION CHANGES

We've hit a few unexpected challenges here, too. We discovered we needed to make some additional adjustments for better ADA accessibility.


This meant moving the new plumbing and tearing down and rebuilding a wall, shifting it approximately 6 inches into the janitor's room.


It's a tough setback when you're only inches off and have to redo and rebuild so much! We could not have anticipated this in the beginning, but we want to do things right and with excellence, even if it means more time and money. The next generation will appreciate us going the extra mile today.


On top of that, the new wall must meet firewall requirements because of the HVAC system. This brings additional city permitting into the process.


These additional requirements have affected both our timeline and financial plan, but we're working through each step and moving forward! We say these things are unexpected, and they are, but you can also expect to find the unexpected when remodeling an old building!


UP NEXT

  • Complete firewall work
  • Frame in new door
  • Frame in and drywall ceiling
  • Complete men's bathroom replumbing
  • Install toilets and sinks
  • Install tile
  • Pass city inspection
  • Fabricate and install bathroom partitions

SANCTUARY

COMPLETED

  • Rebuilt floor support beams where needed
  • Old carpet removed
  • New sanctuary carpet fully installed


UP NEXT

  • New molding around the room
  • A few finishing touches on the new stage


LATER PHASE

  • Painting throughout
  • New lighting

LOBBY & HALLWAYS

COMPLETED

  • Removed lobby wallpaper and professionally repaired drywall on the round wall
  • Rebuilt flooring near the front entrance and installed a water barrier
  • Fresh paint throughout
  • Removed old carpet
  • New electrical work
  • New lighting installed in the lobby and main hallway
  • New decor


IN PROGRESS

  • New LVP (Luxury Vinyl Plank) flooring in the lobby
  • LVP installation throughout the hallways
  • Replacing fluorescent lights with LED lighting in the upper hallways


UP NEXT

  • Finish painting the upper hallway and City Kids hallway
  • Finish remaining molding


LATER PHASE

  • Paint doors

KITCHEN

COMPLETED

  • Entire kitchen gutted
  • Asbestos inspected and mitigated


IN PROGRESS

  • Floor reconstruction is underway


UP NEXT

  • Install new flooring once reconstruction is complete
  • Primer paint on walls


LATER PHASE

  • Complete kitchen rebuild

CENTER CONFERENCE ROOM

COMPLETED

  • Removed old carpet
  • LED lighting installed (still a few more lights to switch over)


IN PROGRESS

  • New LVP flooring installation is underway and approximately halfway complete


LATER PHASE

  • Remove existing wall paneling and wallpaper
  • Repaint the room

FRONT OFFICE

UP NEXT

  • Repair existing floor beams
  • Install new LVP flooring


LATER PHASE

  • Remove wallpaper and paint

Thank you, City Gate!

We cannot say it enough. Thank you for jumping in faith first with us!


Thank you for your prayers, generosity, patience, and continued giving. We know this journey has included a few unexpected turns, but God has been faithful, and we trust Him to continue seeing us through.


We're not just improving a building. We're making room for the next one.